● To avoid any risk of injury caused by a fall, the Box should not be installed

more than 2 meters from the ground.

● Use a DC power supply of 24V DC +/-10%, 2A max.
● Screw the cable into the power connector of the Box.

4

2022-05 V1.4

Summary of Contents for Simplify BMS

Page 1: ...BOX Installation Guide Simplify BMS 2022 05 V1 4 Made in France ...

Page 2: ... IP 852 network 11 In case of LON FT10 network 13 To connect the Box directly to the technical equipment in the absence of a BMS 14 The equipment communicates in Modbus IP 14 The equipment communicates in Modbus RTU RS485 18 The equipment communicates in BACnet IP 23 The equipment communicates in LON FT10 27 The equipment communicates in LON IP 852 28 The equipment communicates in LPB 30 The equip...

Page 3: ...Installation Guide What do you need before starting Provided material Box Dimensions 160 x 110 x 55 mm Weight 340 g GSM standard antenna LoRa standard antenna 1 2022 05 V1 4 ...

Page 4: ...f the communication network s of the BMS Computer access to the Wattsense console Each customer has a dedicated space on the Wattsense User Console at https console wattsense com This interface allows them to manage their fleet of Boxes A Box must have been activated in advance before it can be fully installed and configured If the Box hasn t been activated ask the administrator of the account to ...

Page 5: ...on of where the Box is installed if there are several Boxes on the same site Click on Activate the Box You can then access the configuration tools The power supply of the Box Make sure that the Box has been activated beforehand on the user console Ideally place the Box in an electrical enclosure or cabinet This type of equipment is not suitable for installation in places that can accommodate child...

Page 6: ...any risk of injury caused by a fall the Box should not be installed more than 2 meters from the ground Use a DC power supply of 24V DC 10 2A max Screw the cable into the power connector of the Box 4 2022 05 V1 4 ...

Page 7: ... Connect the cable to the power supply Check that the Power LED is lit steady green light 5 2022 05 V1 4 ...

Page 8: ...vercurrent from the power supply with indication by LED green LED when the power supply is compatible red LED if it is not suitable Change the power supply to avoid damaging the box Wait about 10 seconds the Heartbeat LED flashes green light 6 2022 05 V1 4 ...

Page 9: ... the console it is functional you can go to the connection step of the Box to the equipment and or the network of the building If the Box does not appear on the console see the GSM Antenna chapter GSM Antenna The Box is supplied with a standard GSM antenna For the United States please use an antenna with a gain not exceeding that shown in the table below If the quality of the GSM signal is good ke...

Page 10: ...antenna can for example be moved to the outside or to the other floors to obtain a better signal quality Please note that beyond 15 meters of cable the GSM signal is significantly weakened To connect the Box to the BMS Determine the type s of network s associated with the BMS communication protocols between the BMS server and the technical equipment Obtain if possible the schematic of the communic...

Page 11: ...In case of IP network Except LON Connection Make sure to have an Ethernet cable 9 2022 05 V1 4 ...

Page 12: ...D lights up Configuration If there is no DHCP server on the network attribute a static IP address its mask and the gateway if necessary to the Box Discuss with the building s IT manager If there is a DHCP server on the network the address is automatically assigned Information to retrieve in preparation for the configuration For each device that communicates in Modbus IP 10 2022 05 V1 4 ...

Page 13: ...ve ID the brand and model of the equipment and extra identifying information This information is necessary for the installation configuration and to retrieve data In the case of a BACnet IP network Write down the BACnet port of the network This information will be necessary for the installation configuration and to retrieve data In case of LON IP 852 network Connection Make sure to have an Etherne...

Page 14: ... the LON network Verify that the ETH1 or ETH2 LED lights up Register the IP address of the Box on the IP 852 server of the LON network the IP 852 server s password is probably required Information to retrieve in preparation for the configuration 12 2022 05 V1 4 ...

Page 15: ...necessary for the installation configuration and to retrieve data If you have the NL220 software export the LON database as an archive file or as an NLC file In case of LON FT10 network Connection Make sure to have a USB Echelon U60 FT DIN gateway Connect this gateway to the USB port 1 or 2 of the Box 13 2022 05 V1 4 ...

Page 16: ... database as an archive file or as an NLC file To connect the Box directly to the technical equipment in the absence of a BMS Prepare the list of equipment to be connected and their respective communication protocols Collect the technical documentation of each manufacturer to know where and how to connect to its devices user console configuration wizard manufacturer s site etc Draw up an installat...

Page 17: ...to the Ethernet port of the Box ETH1 or ETH2 Connect the other end of the cable to the equipment Verify that the ETH1 or ETH2 LED lights up Pour connecter 2 équipements Make sure to have 2 Ethernet cables 15 2022 05 V1 4 ...

Page 18: ...d ETH2 Connect the cables to the 2 devices Check that the ETH1 and ETH2 LEDs light up To connect three equipment or more make sure to Have an Ethernet cable for the Box Have as many Ethernet cables as equipment to connect Have an Ethernet switch 16 2022 05 V1 4 ...

Page 19: ... Connect the switch to the power supply Connect an Ethernet cable to the Ethernet port of the Box ETH1 or ETH2 Connect the other end of this cable to the Ethernet switch 17 2022 05 V1 4 ...

Page 20: ...el of the equipment and any information that allows it to be identified This information will be necessary for the installation configuration and to retrieve data The equipment communicates in Modbus RTU RS485 Organization of the Bus architecture Gather the necessary information for each device Bus speed character size parity bit stop bit from the user console s configuration wizard from the manuf...

Page 21: ...19 2022 05 V1 4 ...

Page 22: ...To connect the equipment Caution Do not group together devices with different communication parameters on the same Bus 20 2022 05 V1 4 ...

Page 23: ... Serial wire the network or each of the two networks 21 2022 05 V1 4 ...

Page 24: ...2nd to 2 the 3rd to 3 and so on Caution a network must not contain multiple slaves with the same address Write down the network to which the equipment is connected as well as its address brand and model of the equipment and any identifying information This information will be necessary for the installation configuration and to retrieve data 22 2022 05 V1 4 ...

Page 25: ...ommunicates in BACnet IP To connect one equipment Make sure to have an Ethernet cable Connect the cable to the Ethernet port of the Box ETH1 or ETH2 Connect the other end of the cable to the equipment 23 2022 05 V1 4 ...

Page 26: ...s up To connect two or more devices Make sure to have an Ethernet cable for the Box Make sure to have as many Ethernet cables as equipment to connect Make sure to have an Ethernet switch Connect the power supply to the switch 24 2022 05 V1 4 ...

Page 27: ... Connect an Ethernet cable to the Ethernet port ETH1 or ETH2 of the Box Connect the other end of this cable to the Ethernet switch Check that the ETH1 or ETH2 LED lights up 25 2022 05 V1 4 ...

Page 28: ...f the equipment does not have an IP address assign one to it 192 168 1 1 for the first device then 192 168 1 2 for the second device 192 168 1 3 for the third device and so on Write down the IP address and BACnet port the brand and model of the equipment and any other identifying information This information will be required to configure the installation and to retrieve data 26 2022 05 V1 4 ...

Page 29: ...The equipment communicates in LON FT10 To connect the equipment Make sure to have an Echelon U60 FT DIN USB Gateway Connect it to the USB port 1 or 2 in the Box 27 2022 05 V1 4 ...

Page 30: ...he Neuron ID brand model of the equipment and any identifying information This information will be necessary for the installation configuration and to retrieve data If you have the NL220 software export the LON database as an NLC file The equipment communicates in LON IP 852 To connect one or several types of equipment Make sure to have an Ethernet cable 28 2022 05 V1 4 ...

Page 31: ... Connect the cable to the Ethernet port of the Box ETH1 or ETH2 Connect the other end of the cable to the IP 852 server of the LON network 29 2022 05 V1 4 ...

Page 32: ...ying information This information will be necessary for the installation configuration and to retrieve data If you have the NL220 software export the LON database as an archive file or as a NLC file The equipment communicates in LPB To connect one or several equipement Connect the LPB Bus to the X Bus port of the Box For each device connect its MB cable to the X Bus port and its DB cable to the X ...

Page 33: ...each device configure a unique segment address from 1 to 14 Proceed to make the connection as indicated Designate one and only one equipment as the one that supplies the Bus The equipment communicates in KNX To connect one or several equipement Connect the KNX Bus to the KNX Bus port of the Box Each device must connect its signal to the Hub s signal and its signal to the Hub s 31 2022 05 V1 4 ...

Page 34: ... several equipements The maximum unit load that the Box can handle is three devices 3 6mA If you want to connect more than threeM bus devices you ll have to use an M bus signal repeater Connect the M Bus device to the M Bus port of the Box 32 2022 05 V1 4 ...

Page 35: ...the Box in a central location to ensure the reception of all sensors If the quality of the LoRa signal is good keep the original antenna installed on the Box You can check the quality of the LoRaWAN signal with A field tester The Wattsense User Console Once the Box and the LoRaWAN device are paired you can verify the quality of the signal 33 2022 05 V1 4 ...

Page 36: ...mum of 10 meters of cable this antenna can for example be used outside or in other floors to obtain the best signal quality For each sensor follow these steps 1 Add the sensor to the user console available at https console wattsense com by naming it to be identifiable 2 Save and send the configuration to the Box 3 Activate the sensor to do this use the manufacturer s technical documentation 4 Chec...

Page 37: ...rticles and tutorials https support wattsense com portal en kb To alert the support team about any issues you are experiencing please send an email to support wattsense com or create a ticket in our support platform Please click here https support wattsense com portal en newticket The support team will get back to you as soon as possible 35 2022 05 V1 4 ...