background image

2. Connect 

your Audit

or

Version 1.0_July 2018

Auditor 6W

(WiFi, monitoring-only)

2. Connect 

your Audit

or

Thr

ee-Phase Voltage 

Connections

Use this configur

ation 

when there ar

e multiple

phases present.

The 

voltage 

connections ar

e labelled P1, P2,

 P3, N.

Connect voltage phases t

o P1, P2,

 and P3. Connect

 

neutral t

o N.

Use three-phase 

wiring tails if they 

wer

e provided 

with

your Audit

or.

Single-Phase Voltage 

Connections 

Use this configur

ation 

when one phase is pr

esent.

The 

voltage 

connections ar

e labelled P1, P2,

 P3, N.

Connect P1, P2 & P3 t

o the same phase.

Connect neutral t

o N. 

Use single-phase wiring tails if the

y w

ere pr

ovided

with your 

Auditor

.

Summary of Contents for Auditor 6W

Page 1: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 2: ...For load monitoring arrow is towards the load The CT connections are labelled 6 5 4 3 2 1 The white wires connect to terminals labelled three wires in each terminal The pink wires connect to the termi...

Page 3: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 4: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 5: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 6: ...400 25 600 36 Current Transformer Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is...

Page 7: ...white wires connect to terminals labelled three wires in each terminal The pink wires connect to the terminals labelled The CTs and Voltage phases must match as stated below Place CT connected to On...

Page 8: ...unicate over the internet using the household WiFi the network name and password is required This allows the Wattwatchers energy device to send and receive data over the homeowner s internet link Any...

Page 9: ...T size Log into the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s n...

Page 10: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 11: ...s ve and expected value on all circuits Grid and load CTs are installed correctly Ensure CT phase and orientation are correct CTs on the wrong phase may cause negative PF readings Where there is solar...

Page 12: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 13: ...the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s network open a w...

Page 14: ...ees 400 25 600 36 CT Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is towards the lo...

Reviews: