3. WiFi settings

Phase C

Phase A

GRID SUPPLY

MAIN SWITCH

Load

Neutral

Neut ral Block

Phase B

Auditor

CB

kWh

METER

1

2

3

N

4

5

6

3 2 1

Inverter

K

L

K

L

CT1

+ –

CT2

+ –

L1

L2

L3

CT5

+ –

CT6

+ –

L

K

L

K

CT3

+ –

L

K

K

L

CT4

+ –

x

x

x

x

CB

x

x

x

x

x

Auditor 6 Wiring Diagram

Supply

3 phases

Loads

None

Solar

3 phases

3. WiFi settings 

continued 

 

4. Use the onboarding tool

5)

   Whilst connected to the Auditor’s network,  

open a web browser  and navigate to  

auditorsetup.com

6)

   The screen will then display the available site 

networks. Select the site  network and connect. 

7)

   Enter the password for the  site WiFi network. Enter 

and press connect.

8)

   Once connection starts, the Auditor  LED lights will 

flash whilst it establishes a connection.

9)

   A successful connection to the site WiFi will be 

shown  when all LED lights go solid green (no 

flashing). If this step fails the WiFi network signal 

may be too weak.

The onboarding tool at

 

onboarding.wattwatchers.com.au

 

collects the installation 

details for each site including device serial number, circuit names and CT size. Log 

into the onboarding tool and work through the steps to configure your devices for 

the installation site.

Wattwatchers WiFi Setup

Page 2 of 2

5.

Whilst connected to the Wattwatchers device’s
network, open a web browser and navigate to
auditorsetup.com

6.

The screen will then display the available home
networks.  Select the home network and connect.

7.

At this time you will need to enter the password for
the home WiFi network.  Enter and press connect.

8.

Once connection starts, the Wattwatchers energy
device LED lights will flash whilst it establishes a
connection.

9.

A successful connection to the home WiFi will be
shown when all LED lights go solid green (no flashing)

Most common problem when connecting WiFi networks is signal strength 
from the home WiFi access point to the location of the device.  This can be a 
problem whether the meter box door is open or closed, usually worse when 
closed.

Place CT connected to ...

On cables connected to ...

1+ and 4+

P1

2+ and 5+ 

P2

3+ and 6+ 

P3

Summary of Contents for Auditor 6W

Page 1: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 2: ...For load monitoring arrow is towards the load The CT connections are labelled 6 5 4 3 2 1 The white wires connect to terminals labelled three wires in each terminal The pink wires connect to the termi...

Page 3: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 4: ...that Current Transformer can accommodate the cable size i e cable diameter fits within CT opening width Ensure there is a way to isolate the Auditor voltage inputs An existing or new circuit breaker...

Page 5: ...e connections are labelled P1 P2 P3 N Connect voltage phases to P1 P2 and P3 Connect neutral to N Use three phase wiring tails if they were provided with your Auditor Single Phase Voltage Connections...

Page 6: ...400 25 600 36 Current Transformer Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is...

Page 7: ...white wires connect to terminals labelled three wires in each terminal The pink wires connect to the terminals labelled The CTs and Voltage phases must match as stated below Place CT connected to On...

Page 8: ...unicate over the internet using the household WiFi the network name and password is required This allows the Wattwatchers energy device to send and receive data over the homeowner s internet link Any...

Page 9: ...T size Log into the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s n...

Page 10: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 11: ...s ve and expected value on all circuits Grid and load CTs are installed correctly Ensure CT phase and orientation are correct CTs on the wrong phase may cause negative PF readings Where there is solar...

Page 12: ...tor should be lit solid The table below shows the meaning of the lights Auditor 6W Indicators L1 Mode L2 Network L3 Internet Explanation Blink Off Off No WiFi network Code started Blink Blink Off Foun...

Page 13: ...the onboarding tool and work through the steps to configure your devices for the installation site Wattwatchers WiFi Setup Page 2 of 2 5 Whilst connected to the Wattwatchers device s network open a w...

Page 14: ...ees 400 25 600 36 CT Direction Install Current Transformers CTs such that For grid monitoring arrow is from grid For solar monitoring arrow is from inverter For load monitoring arrow is towards the lo...

Reviews: