STEPS OF INSTALLATION
Source Water Tank
W
ater Outlet Line
Water Inlet Line
R.O. Valve
Raw Water
Ÿ
Make sure you read the operating instruction before operating the machine.
Ÿ
Connect to the water power source (15 AMP socket, 220-volt AC) - for 5G - Max only.
Ÿ
Follow the panel overview to know the machine's status and functions.
Ÿ
Connect water supply to the water purified before using as shown in the diagram above.
Ÿ
Connect to the water power source (6 AMP socket, 220-volt AC) - for 5G - Pro only.
Ÿ
Switch on the machine and make sure there are no leakages in the pipe connections.
NOTE
: Please flush at least 2 tanks of water from ambient water storage and cold-
water storage before consuming the water.
Ÿ
If you follow the exact steps of installation then our water purifier wastes zero%* of
water.
NOTE :
This procedure only works upto 5 floors.
Raw W
ater
19