Page 24
Chapter 3 –
TnT+
Portable Appliance
Test Instructions
POWER TEST
Menu 2
PROCEDURE:
1. Complete a VISUAL INSPECTION on the DUT (Device Under Test)
[refer to page 13 for details – ‘Visual Inspection’].
IF THE DUT PASSED THE ‘VISUAL INSPECTION’, CONTINUE WITH THE FOLLOWING
INSTRUCTIONS
[if not, refer to page 13 ‘IF RESULT IS A FAIL’]:
2. Plug in IEC adaptor lead into DUT socket ( Remove Earth lead if inserted - Please
read note below)
3. Plug Male end of DUT into DUT socket
4. Press the F1 key
RESULTS ARE DISPLAYED
5. Read the result and record appropriately.
6. Unplug the Extension lead /Power board.
7. Press the Enter key to return to the Main Menu.
IF THE RESULT OF THE TEST WAS A ‘PASS’ - Tag the DUT with the appropriate tag,
including ‘Next test Due’ date and return to service.
IF THE RESULT OF THE TEST WAS A ‘FAIL’ - Tag the DUT with a DANGER TAG AND
REMOVE THE DUT FROM SERVICE.
[Illustration above is for demonstration only]
The Power Test is for the purposes of monitoring and performance
testing the DUT up to the current value 10Amps (resistive load)
The Power TEST completes the following sequence as part of its comprehensive
testing procedure:
1. Integrated SUPPLY MAINS TEST
[see page 11 for details]
2.
POWER TEST
PLEASE NOTE: A VISUAL INSPECTION MUST BE CARRIED OUT
BEFORE ANY OTHER TESTS.
[refer to page 13 for more details]
Summary of Contents for TNT+
Page 34: ...Page 34...
Page 35: ...Page 35...