7
Producent kajaków i łodzi
składanych
06-500 Mława, Parcele Łomskie 15 tel / fax (+48) (0) 23 654 44 06, 509793269
www.wayland.com.pl
e-mail:
kajak@hot.pl
Assemble breakwater. T-shape hook GB1 insert to the groove in the tongue of front deckbar WPP1 and then
close the connection rotating brekwater to the position parallel with the boat axis. Go to the rear cockpit and
join breakwater with rib W6 using fittings riveted on the breakwater ends and brackets on the rib W6 (see fot.
21)
Insert remaining T-shape hooks screwed on breakwaters across the corresponding steel eyelets on the upperdeck
and then insert them to the locks on the ribs W3, W4 i W5 and latch the locks pressing the lever.
Now insert the trimmed edge of cockpit into the groove in the upper side of breakwater (see pic 21)
Assemble breakwater rim ZTB1 (bumerang)
Now fill four airsponsons, symmetrically, by use of proper pipe valves on the sides of them. Filling of
airsponsons must be alternately left side / right side / and again left side / right side until the airsponsons are
filled and reasonably stiff to get symmetry of the boat shape. Pressure inside the airsponsons should not exceed
1.2 ATM .
Mount seats. Unbuckle seats sets and pump airchambers included inside, depending on required height. There
are two airchambers for seat and one for backrest. Now place seats on the places with attached velcro types
Velcro types attached to the floor and seats keep seats in stable position Now join seats side straps to the D-rings
mounted on the side ladders in corresponding position.
Now the kayak is ready for use
Disassembly must be performed in opposite way