16
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
Tools Needed:
13
14
Top Section
When installing a door with a
TorqueMaster
®
Plus counterbalance
system, vertical track alignment is
critical. Position flagangle between
1-11/16” (43 mm) to 1-3/4” (44 mm)
from the edge of the door. Tighten the
bottom lag screw. flagangles must be
parallel to the door sections. Repeat for
opposite side.
IMPORTANT:
ThE DIMENSION BETWEEN
ThE fLAGANGLES MuST BE DOOR WIDTh
PLuS 3-3/8” (86 MM) TO 3-1/2” (89 MM)
fOR SMOOTh, SAfE DOOR OPERATION.
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws. Push
the vertical track against the rollers so
that the rollers are touching the deepest
part of the curved side of the track (see
illustration). Tighten all the carriage bolts
and nuts. Repeat for opposite side.
vertical Track Alignment
DOOR WIDTh
+3-3/8” TO 3-1/2”
NAIL
1-11/16” TO 1-3/4”
fLAGANGLE
TOP SECTION
Place the top section in the opening and
vertically align with lower sections.
Temporarily secure the top section by
driving a nail in the header near the
center of the door and bending it over
the top section.
Now flip up the hinge leaf against
section, fastening center hinge(s) first
and end hinges last.
Power Drill
7/16” Socket
Driver
Tape Measure
hammer
Nail
Power Drill
7/16” Socket
Driver
7/16” Wrench
Tape Measure
ROLLER
VERTICAL TRACk
ROLLER AGAINST
VERTICAL TRACk