22
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
CENTER
BRACkET
ASSEMBLy
(2) 5/16” X 2” hEX
hEAD LAG SCREWS
Securing Center bracket bushing
22
NOTE:
If you are not installing the
i
drive
®
opener on your garage door, you
must install the center bracket bushing
assembly, follow these instructions.
To locate the center bracket, mark the
header halfway between the flagangles
and level the TorqueMaster
®
spring
tube. Drill 3/16” pilot holes into header
for the lag screws. fasten the metal
bracket to the header using
(2) 5/16” X 2” lag screws.
Power Drill
3/16” Drill Bit
7/16” Socket
Driver
Step Ladder