GreyT Elevator V3 - User Guide
(Rev 1)
Page 18
wcproducts.com
Step 7
Bolt the 1st Stage Vertical Tubes to the assembled 1st Stage Horizontal Tubes. The
holes in the vertical tube must be drilled clearance for #10-32 bolts with the outside face
drilled to 3/8”, similar to how the Elevator Base Tube is done. When assembled, the
#10-32 x 3/8”L bolts should sit inside the 1st Stage Vertical Tube.