GreyT Elevator V3 - User Guide
(Rev 1)
Page 23
wcproducts.com
Step 12
Bolt the Carriage Vertical Tubes to the assembled Carriage Horizontal Tubes. The holes
in the vertical tubes must be drilled clearance for #10-32 bolts with the outside face
drilled to 3/8”, similar to how the Elevator Base Tube is done. When assembled, the
#10-32 x 3/8”L bolts should sit inside the Carriage Vertical Tube.