Dosing Device Foamdos V6
Index: 01
Date modified: 26/08/2019
OI No.: BA DW 025-00 Foamdos V6 EN.DOCX
Page 17 of 37
5
Commissioning
5.1
Commissioning - remarks
The tasks described here must only be performed by appropriately qualified personnel belonging to a specialist
company. Alternatively, the work can be carried out by persons who have read and understood the entire
operating instructions. Prior to commissioning, the installed system must be checked for proper installation
and leaks.
Please use the commissioning protocol from
Chapter 9.3
The device comes loaded with factory settings. During the commissioning, adjust the control parameters to
the desired operating mode and enter them in the operation data sheet in
Chapter 9.4
.
5.2
Commissioning works
Ensure that the device has been correctly installed and connected.
5.2.1
Prepare the foam concentrate
1. Place the canister with the foam concentrate under the device.
2. Remove the canister lid.
3. Place the suction lance in the canister.
4. Screw the suction lance’s lid on the canister. If necessary, replace the suction lance’s lid.
5. Check that the suction lance reaches the bottom of the canister.
6. If necessary, push suction lance downward.
5.2.2
Insert the roller carrier at the fragrance pump
1.
Remove the snapped-in, transparent pump cover and the safety disc (32). Pull the hose bracket (33) out
of the guide in the casing.
Key
31.
Transparent pump cover (not shown)
32.
Safety disc
33.
Hose bracket with dosing hose (hose kit)
34.
Roller carrier (not visible)
35.
Pump casing
41.
Suction connection
42.
Pressure connection
The peristaltic pump is fitted with a white dosing hose.
2.
Push the roller carrier onto the shaft.
Figure 13, Insert roller
carrier
Figure 12, Peristaltic pump
32
35
34
33
41
42