Brine Nebulization System, Type Soldos V3
Index: 03
Change date: 01/03/2017
Operating instructions no.: BA DW 005-03 Soldos V3 EN.docx
Page 63 of 70
9.3
Commissioning protocol / instruction
This protocol is to be completed by the commissioning technician! All warranty claims expire when no
completed and signed commissioning protocol is available!
The commissioning protocol is included in the documents attached.
Summary of Contents for Soldos V3
Page 72: ......