5
7RƂ[PRXQWLQJƃDQJH
A
, insert and tighten
screws
D
.
Attention
: Nylon washers
J
must remain in
position to provide sealing.
7) Connect mains supply cable
G
leads to
respective terminals of socket
K
:
a) ON/OFF (L = Phase, N = Neutral,
= Earthing)
b) 1-10 V/DALI (L = Phase, N = Neutral,
= Earthing, DA/DA = DALI control line,
D–/D+ = 1-10 V control line).
8) Ensure that all surfaces are clean and dry.
3RVLWLRQOXPLQDLUHRYHUPRXQWLQJƃDQJH
A
and attach terminal connector
C
. Tighten
screws
B
.
5) Feed mains supply cable
G
(and second cable
H
for through wiring, if required) through mem-
brane spout(s)
I
ZKLOHVHWWLQJPRXQWLQJƃDQJH
A
in position.