ATTACHMENT BETWEEN WOOD JOISTS
Attachment between wood joists means that the direction of the track line is parallel to the direction
of the joists. If the joists are 2” x 4”, either the Top-Down Method or the Bottom-Up Method can be
used, but lifting capacity cannot exceed 700 lbs. If the joists are at least 2” x 6”, there are no limitations
on lifting capacity. If there is workable space above the ceiling, use the Top-Down Method, as
described in the previous section. If there is no workable space above the ceiling, The Bottom-Up
Method must be used. When attaching between joists, the Bottom-Up Method of attachment is
different than described in the previous section.
Bottom-Up Method:
This method is used when the joists are located between floors, and where there is no workable access
above the ceiling.
GoLift
Installation Manual Rev. 27-Mar-2017
Summary of Contents for GoLift
Page 1: ...GoLift Installation Manual Rev 27 Mar 2017 1 GoLift Hoist INSTALLATION GUIDANCE...
Page 6: ...6 Figure 1 Top Down Wood Joist Installation GoLift Installation Manual Rev 27 Mar 2017...
Page 7: ...7 GoLift Installation Manual Rev 27 Mar 2017...
Page 13: ...13 Figure 4 Multiple Anchor Attachments GoLift Installation Manual Rev 27 Mar 2017...
Page 14: ...14 Figure 5 Concrete Slab Installation GoLift Installation Manual Rev 27 Mar 2017...
Page 16: ...16 Figure 6 Epoxy Anchors in Hollow Core Concrete GoLift Installation Manual Rev 27 Mar 2017...
Page 18: ...18 Figure 8 Attaching to Steel I Beams GoLift Installation Manual Rev 27 Mar 2017...