10
Circuitry designed into the AC Inverter monitors the utility to detect any
abnormalities. This is accomplished by measuring the frequency and amplitude of
the utility and verifying that it remains within the specified range given in Section
2.6 Technical Specifications.
The AC Inverter operates under current control instead of the more common phase
control. This allows for a more robust interface to the utility and linear response in
the inverter dynamics. In addition, references for the current are obtained from the
utility waveforms, thereby maintaining the AC Inverter as a true unity power factor
interface regardless of line harmonics.
Figure 2 shows the AC Inverter front panel. See Table 3 for a description of AC
Inverter panel functions.
Figure 2. AC Inverter Front Panel
The main circuit breaker must be switched off and locked
out by authorized factory personnel; and, either the Main
Power or Emergency Off switch service must be switched
off to remove power from the system for at least five (5)
minutes prior to accessing the interior of the cabinet.
Summary of Contents for 900EX
Page 1: ...Installation Operation and Maintenance Manual EV Test Systems 900 EX ...
Page 6: ...iv ...
Page 7: ...Chapter 1 Introduction ...
Page 11: ...Chapter 2 System Description ...
Page 25: ...Chapter 3 Installation ...
Page 29: ...Chapter 4 Operation ...
Page 48: ...42 ...
Page 49: ...Chapter 5 Maintenance ...
Page 53: ...Appendix A Glossary of Terms ...
Page 58: ...52 ...
Page 59: ...Appendix B DC I O Connector Assembly ...
Page 63: ...Appendix C 900 EX Remote Voltage Sense Operation ...
Page 66: ...60 ...
Page 67: ...Appendix D High Voltage Interlock Wiring ...
Page 69: ...Appendix E Index ...
Page 72: ...22855 03 04 ...