12
CR4
Caution!
For commissioning, only carry out the pre-start work described in paragraph 2.4.
Keep to the initial maintenance intervals (refer to paragraph 3.2.1).
- Put the soil compactor out of operation as described in
paragraph 2.7.
- Lock the handle (2/1) by means of the spring bar (2/2).
Danger!
Never use the handle (2/1) for lifting the machine by
crane. The machine may overturn!!
- Put the crane hook (2a/1) into the protection frame (2a/2).
Danger!
Only use a lifting tackle and a crane of a sufficient
bearing capacity.
Danger!
Do not enter the zone under the suspended load.
2.2 Transport
2.2.1 Loading by Crane
2.3 Commissioning
Figure 2
1
2
Figure 2 a
1
2
Short distances on the job site can be covered by the soil
compactor in accordance with paragraph 2.6.
For transporting the compactor over long distances, however,
the machine can be lifted on an appropriate transport vehicle
(truck, trailer) by means of a crane.