Chapter 7
Adjustment and initial operation
32708885 Geset 100
Version: 16.07.13
Page 38 of 77
GB
Adjustment and initial operation
The labeling system has to be re-adjusted at initial operation or at a product change. The
adjustments comprise two functions, operation of the controller (s. from page 55) and me-
chanical setup of the assembly groups (explained in the following).
In following adjustment table all required working steps are listed. Experienced operators
may use the adjustment tables later on as a checklist.
Requirements
¥
Control about product transport.
¥
One or more sample products.
¥
Labeling system is connected to power. Triggering of the labeling system is pos-
sible by product sensor or I/O-interface.
Instruction
Please put the labeling system Geset 114 into operation as follows.
Step
Procedure
1
If there are already exist notes of the „adjustment values“
(ref. page 37) for
the product to be labeled, the values should be available.
2
Adjust base conveyor (s. from page 40).
3
Adjust side guidance (s. from page 41).
4
Adjust top conveyor Geset 114 (s. from page 42)
5
Insert label roll in labelerr (s. from page 46)
6
Adjust product light barrier (s. from page 46)
7
Change peeler plate (s. from page 47)
8
Positioning of peeler plate to product (s. from page 48)
9
Pitch peeler blade (Gimbal adjustment) (s. from page 50)
10
Adjust pusher roller, - brush and – squeegee (s. from page 52)