Chapter 9
Maintenance
32708885 Geset 100
Version: 16.07.13
Page 60 of 77
GB
Daily servicing (after appr. 8 hours of operation)
Please arrange this maintenance at each roll change or at least once per day.
Requirements
¥
Labeler is without electrical power.
¥
No transportation of products.
Required equipment
¥
Alcohol (*21800915) or roller solvent (*21800977)
¥
Lint-free cloth (*21800978)
¥
Label remover (*21800771)
*Product recommendation. Can be obtained from the Bluhm Weber Group with the eight-character article number.
Instruction
Please arrange the daily maintenance as follows.
Step
Procedure
1
Arrange the required maintenance work at the labelers (Description s. cor-
respondent chapter in provided manual of Alpha …).
2
Check…
¥
Base conveyor
¥
*²Top conveyor
¥
*²Pusher brushs, -squeegee or -rolls
¥
Conveyor belts
¥
Product guidings and deflection rollers
…for label- and adhesive residues. Remove residues with label remover or
alcohol. (Instruction s. page 66 )
3
Examine / clean the *²air filters of switch cabinet, protective cabinets.
4
Examine moving or rotating system parts for mobility and freewheel as well
as for fix position of the mounting parts. Only few stress marks or –noises
have to be observed. Possible repairs have to be arranged professionally.
*²Only if system has the appropriate features.
Summary of Contents for Geset 100
Page 2: ...Blank page ...