Chapter 9
Maintenance
32708885 Geset 100
Version: 16.07.13
Page 61 of 77
GB
Weekly servicing (after appr. 40 hours of operation)
Requirements
¥
Labeler is without electrical power.
¥
No transportation of products.
Required equipment
¥
Alcohol (*21800915) or roller solvent (*21800977)
¥
Lint-free cloth (*21800978)
¥
Label remover (*21800771)
¥
Compressed air spray (*21800768)
¥
Soft brush (round or flat, appr. 100 mm)
*Product recommendation. Can be obtained from the Bluhm Weber Group with the eight-character article number.
Instruction
Please arrange the weekly maintenance as follows.
Step
Procedure
1
Clean all sensors (product-, low label-, label gap sensor) carefully with a soft
brush and compressed air spray. (Instruction s. page 63)
2
Examine lines, tubes, screw connections, valves, cylinders and motors for
leak tightness and/or fixed seat.
Possible repairs have to be arranged immediately and professionally.
3
Check …
¥
Base conveyor
¥
*²Top conveyor
¥
*²Pusher brushs, -squeegee or -rolls
¥
Conveyor belts
¥
Product guidings and deflection rollers
… for wear or damages. (Transverse cracks and frayed edges. Instruction s.
page 65). Possible repairs have to be arranged immediately and professio-
nally.
4
Remove possible dust deposits from the labeling station.
5
Check the emergency stop device for function.
*²Only if system has the appropriate features.
Summary of Contents for Geset 100
Page 2: ...Blank page ...