4
NORTH AMERICA
CONTENTS
PAGE
REFERENCE CARD
2,3
SECTION 1: INSTALLATION GUIDELINES
1.0 CHECK LIST
SECTION 2: PRECAUTIONS
2.0 SAFETY PRECAUTIONS
6
2.1 WELDING PRECAUTIONS
6
SECTION 3: COUPLER INSTALLATION
3.0 SAFETY DURING COUPLER INSTALLATION
7
3.1 COUPLER ORIENTATION
7
3.2 REMOVING THE EXISTING BUCKET
8
3.3 FITTING THE COUPLER (LINK PIN)
8
3.4 FITTING THE COUPLER (DIPPER PIN)
9
SECTION 4: HYDRAULIC KIT INSTALLATION
4.0 HOSE CLAMP BRACKET POSITION
10
4.1 FITTING THE HOSE CLAMP BRACKET
10
4.2 THE I-LOCK CONTROL VALVE
11
4.3 INSTALLING THE CONTROL VALVE
11
4.4 HOSE ROUTING
12
4.5 HOSE ROUTING – DIPPER ARM
12
4.6 HOSE ROUTING – BOOM
13
4.7 HOSE ROUTING – BOOM TO VALVE
14
4.8 HOSE ROUTING VALVE TO PUMP / TANK
14
SECTION 5: ELECTRICAL INSTALLATION
5.0 ELECTRICAL INSTALLATION
15
SECTION 6: ASSEMBLIES
6.0 LOOSE HOSE KIT ASSEMBLY
16
6.1 PRE-CRIMPED HOSE KIT ASSEMBLY
16
6.2 ELECTRICAL SCHEMATIC
17
SECTION 7: FINISH & TEST
7.0 FINISH & TEST
18
SECTION 8: DECALS
8.0 IN CAB DECALS
19
SECTION 9: TORQUE CHARTS
9.0 TORQUE CHART – METRIC BOLTS
20
9.1 TORQUE CHART – JIC CONNECTORS
20
9.2 PRESSURE SETTING CHART
20