3
3-36 | CFW-11M RB
Installation and Connection
NOTE!
Shielded cables must be used for the signal connection of the synchronism board to the XC1 conector.
It is recommended to ground the cables shielding according to item 3.4.9.
Figure 3.50 -
CSR11 syncronism board connection
Figure 3.51 -
CSR11 assembly on the UC11
3.4.9 Control Connections
The control connections (analog inputs/outputs, and digital inputs/outputs) must be made at the electronic
control board CC11 RB terminal strip XC1, at the UC11 control unit.
Functions and typical connections are presented at Figures 3.52
(a)
and
(b)
.