19
53. Wrap the Squat Cable (73) under a 90mm Pulley
(78). Attach the Pulley and a Cable Trap to the sec-
ond set of holes from the top in the indicated brack-
et on the Long Base (106) with an M10 x 50mm
Bolt (100) and an M10 Nylon Locknut (87).
Make
sure that the Cable Trap is turned to hold the
Cable in the groove of the Pulley.
54. Wrap the Squat Cable (73) over a 115mm Pulley
(119). Attach the Pulley to the indicated bracket on
the Top Frame (6) with an M10 x 45mm Bolt (93)
and an M10 Nylon Locknut (87).
55. Place a 50mm Washer (1) on top of the Weight Tube
(43) closest to the Squat Upright (4). Thread an M12
Nut (118) halfway onto the end of the Squat Cable
(73).
Lift the Weight Tube (43) and the Top Weight (45)
and make sure that the small pin on the Weight
Tube is inside of the groove under the Top Weight.
Hold the Weight Tube (43) and the Top Weight (45)
a few inches over the weight stack and insert the
Weight Pin (50). Screw the end of the Squat Cable
(73) two full turns into the Weight Tube. Then, tighten
the M12 Nut (118) against the 50mm Washer (1).
Remove the Weight Pin and set the Top Weight
back on the weight stack. Replace the Pin.
56.
Locate and open the parts bag labeled “SEAT
ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the
Seat Upright (9). Wet the Tube and inside of the
two Knee Pads (19) with soapy water. Slide the
Pads onto the Pad Tube as shown. Press the two
Knee Pad Caps (109) into the ends of the Pad
Tube.
Wet the Leg Lever (10) and inside of the two Short
Pads (20) with soapy water. Slide two Pads onto
the Leg Lever.
56
53
54
55
119
73
10
20
20
23
19
19
9
109
109
87
78
68
100
106
SEAT ASSEMBLY
73
6
87
93
43
4
73
118
1
45
50