17
38
93
32
74
35
38
38. Wrap the Ab Cable (74) over a 90mm Pulley (35)
in the direction shown. Attach the Pulley and a
Cable Trap (38) to the second set of holes from
the bottom in the indicated pair of Pulley Plates
(32) with an M10 x 48mm Bolt (93) and an M10
Nylon Locknut (90). Make sure the Cable Trap
is positioned to hold the Cable in the groove
of the Pulley.
37. Wrap the Ab Cable (74) under a 90mm Pulley
(35). Attach the Pulley to the indicated bracket on
the Center Base (2) with an M10 x 97mm Bolt
(77) and an M10 Nylon Locknut (90).
Note: The M10 x 97mm Bolt (77) must be
inserted through both brackets on the Center
Frame (2). Tighten the M10 Nylon Locknut (90)
only a few turns onto the Bolt; it will need to
be removed in step 39.
39
74
35
35
35
90
90
77
2 95
94
2
35
74
Bracket
38
39. Remove the M10 x 97mm Bolt (77) and the
M10 Nylon Locknut (90) used in step 37.
Wrap the Ab Cable (74) under a 90mm Pulley (35)
as shown. Attach the Pulley to the indicated brack-
et on the Center Base (2), and the 90mm Pulley
(35) used in step 37 to its bracket, with the M10 x
97mm Bolt (77) and the M10 Nylon Locknut (90).
Note: Make sure the Pulley used in step 37 is
attached as shown.
Wrap the Ab Cable (74) around a 90mm Pulley
(35) as shown. Slide the Pulley and a Cable Trap
(38) onto the M10 x 89mm Carriage Bolt (95) in
the Center Base (2). Secure the Pulley with an
M10 Nylon Locknut (90). Make sure the Cable
Trap is positioned to hold the Cable in the
groove of the Pulley.
40
40. Lay the Ab Cable (74) inside the indicated bracket
on the Center Base (2). Attach a 90mm Pulley
(35) inside the bracket with an M10 x 45mm Bolt
(94) and an M10 Nylon Locknut (90).
37
74
77
90
2
35
90
90