10
11. Grease an M10 x 51mm Bolt (66). Attach a Cable
Pivot (39) to the Left Arm (10) with the Bolt and
an M10 Nylon Locknut (56).
Do not overtighten
the Locknut; the Cable Pivot must be able to
pivot easily.
Wet the inside of a Large Foam Pad (42) with
soapy water. Slide the Large Foam Pad onto the
Left Arm (10).
Attach a Handle (11) to the Left Arm (10) with two
M10 x 25mm Button Bolts (77) and two M10
Washers (57).
Assemble the Right Arm (9) in the same
manner.
13.
Refer to the CABLE DIAGRAMS on page 20 as
you assemble the cables and to identify the
cables.
Locate the Arm Cable (54).
Grease an M8 x
22mm Shoulder Bolt (65). Attach the Cable to the
indicated Cable Pivot (39) with the Bolt and an
M8 Nylon Locknut (58).
12. Grease an M10 x 85mm Bolt (67) and two Arm
Bushings (44). Attach the Right Arm (9) to the
Pivot Frame (5) with the Bolt, two M10 Washers
(57), the two Arm Bushings, and an M10 Nylon
Locknut (56).
Do not overtighten the Locknut;
the Arm must be able to pivot easily.
Attach the Left Arm (10) to the Pivot Frame (5)
in the same manner.
11
12
11
10
39
57
77
57
66
56
9
10
42
9
44
56
57
57
5
67
58
65
54
39
Grease
Grease
Grease
Grease
13
Cable Assembly