19
53. Wrap the Squat Cable (73) under a 90mm Pulley
(78). Attach the Pulley and a Cable Trap (68) to the
second set of holes from the top in the indicated
bracket on the Long Base (101) with an M10 x
50mm Bolt (100) and an M10 Nylon Locknut (87).
Make sure that the Cable Trap is turned to hold
the Cable in the groove of the Pulley.
54. Wrap the Squat Cable (73) over a 115mm Pulley
(119). Attach the Pulley to the indicated bracket on
the Top Frame (6) with an M10 x 45mm Bolt (93)
and an M10 Nylon Locknut (87).
55. Place a 50mm Washer (1) on top of the Weight Tube
(43) closest to the Squat Upright (4). Thread a M12
Nut (118) halfway onto the end of the Squat Cable
(73).
Lift the Weight Tube (43) and the Top Weight (45)
and make sure that the small pin on the Weight
Tube is inside of the groove under the Top Weight.
Hold the Weight Tube (43) and the Top Weight (45)
a few inches over the weight stack and insert the
Weight Pin (50). Screw the end of the Squat Cable
(73) two full turns into the Weight Tube. Then, tighten
the M12 Nut (118) against the 50mm Washer (1).
Remove the Weight Pin and set the Top Weight
back on the weight stack. Replace the Pin.
56.
Locate and open the parts bag labeled “SEAT
ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the
Seat Upright (9). Wet the Pad Tube with soapy
water. Slide the two Knee Pads (19) onto the Pad
Tube as shown. Press the two Knee Pad Caps
(109) into the ends of the Pad Tube.
Slide two Short Pads (20) onto the Leg Lever (10).
56
53
54
55
119
73
10
20
20
23
19
19
9
109
109
87
78
68
100
101
SEAT ASSEMBLY
73
6
87
93
43
4
73
118
1
45
50