Part Number 550-142-302/0520
CGi
SERIES 4 — GAS-FIRED WATER BOILER —
Boiler Manual
6
Prepare boiler location — codes & checklist
1a
Installations must follow these codes:
•
Local, state, provincial, and national codes, laws, regulations and ordinances.
•
National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition.
•
Where required by the authority having jurisdiction, the installation must conform
to the Standard for Controls and Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1 –– latest edition.
•
National Electrical Code, ANSI /NFPA 70 – latest edition.
• For Canada only: Natural Gas and Propane Installation Code, CAN/CSA B149.1
or B149.2 Installation Code, CSA C22.1 Canadian Electrical Code Part 1 and any
local codes.
The CGi boiler gas manifold and controls meet safe operating and other
performance criteria when boiler underwent tests specified in ANSI
Z21.13 – latest edition.
For the Commonwealth of Massachusetts, read and follow the special
instructions located on page 15 of this manual.
Before locating the boiler,
check the following:
•
Check for nearby connection to:
•
System water piping
• Venting
connections
•
Gas supply piping
• Electrical
power
• Check area around boiler.
Remove any combustible materials, gasoline
and other flammable liquids, or other contaminants
.
Failure to keep boiler area clear and free of
combustible materials,
gasoline and other flammable liquids and vapors
can result in
severe personal injury, death or substantial property damage.
•
Boiler must be installed so that gas control system components are protected from
dripping or spraying water or rain during operation or service.
• If new boiler will replace existing boiler, check for and correct system problems,
such as:
1. System leaks causing oxygen corrosion or section cracks from hard water
deposits.
2. Incorrectly-sized expansion tank.
3. Lack of antifreeze in boiler water causing system and boiler to freeze and
leak.