Installation and Startup Guide

 

This document covers the installation of cMT-iV6 Series HMI, for the detailed specifications and 
operation, please refer to Datasheet, Brochure and EasyBuilder Pro User Manual. Please read all 
warnings, precautions, and instructions on the device carefully before use. 

Install Environment: 

NEMA Rating

 

The 

HMI product is NEMA 4 rated (Indoor Only). 

 

Electrical 
Environment

 

The 

HMI product has been tested to conform to European CE requirements. This 

means that the circuitry is designed to resist the effects of electrical noise. This 
does not guarantee noise immunity in severe cases. Proper wire routing and 
grounding will insure proper operation.

 

Environmental 
Considerations

 

(1)  Make sure that the displays are installed correctly and that the operating 

limits are followed. Avoid installing units in environments where severe 
mechanical vibration or shocks are present. 

(2)  Do not operate the unit in areas subject to explosion hazards due to 

flammable gases, vapors or dusts.

 

(3)  Do not install the unit where acid gas, such as SO2 exists. 
(4)  This device should be mounted in the vertical position and for use on the flat 

surface enclosure.

 

(5)  Conform to UL 61010-2-201 safety requirement for use in Pollution Degree 

2 Environment.

 

(6)  Relative Humidity: 10% ~ 90% (non-condensing)

 

Cleaning 
Considerations 

Clean the device using dry cloths. Do not use liquid or spray detergents for 
cleaning. 

IP rating 

IP 65 

 
Warning 

Protection impairment if used in a manner not specified by the manufacturer. 
Déficit de protection si utilisé d'une manière non spécifiée par le fabricant. 

Unpacking the Unit

 

Unpack and check the delivery. If damage is found, please contact the supplier.

 

 

NOTE: 

Place the operator panel on a stable surface during installation. Dropping it or letting it 

fall may cause damage. 

The package includes: 
(1) Installation Instruction, 2-sided A4 *1 (2) Human Machine Interface *1 (3) Power Connector *1 
(4) Brackets & Screws *1 pack (5) Fuse 1.25A/250V 5*20mm *1 
 
The packing box can be transformed into an HMI stand. Please follow the steps to make the stand. 
1. Remove the center of the box cover along the perforated line.   
2. Pull the two inner flaps. 
3. Press down along the perforated line inside the box. 
4. Complete the stand as shown. 

 

 

Installation Instructions 

Use a control box that provides enough stiffness. 
Cutout Dimension: 250 mm x 192 mm. Secure the 
operator panel in position, using all the fastening 
holes and the provided brackets and screws. 
Screw Torque: 2.6 ~ 3.9 lbf.in. (For reaching 
waterproof effect and preventing the panel from 
being deformed.) 
Plan for adequate space around the unit and inside 
the enclosure, for ventilation and cables. Consider 
the heat from other devices inside the enclosure. 
The ambient temperature around the unit must be 
0 ~ 50°C 
Minimum required clearances (along the overlay): Top / Bottom / Sides 15 mm 
Maximum panel thickness: 4.5 mm 
 

Power Connections 

Power Connector Specifications:   
Wire AWG: 28~12 
Operating Temperature: -40°C ~105°C 
Screw Torque: 3.47 lbf-in (max.) 
 

NOTE:   

1. Connect positive DC line to the ‘+’ terminal and 
the DC ground to the ‘-’ terminal. 

System Settings 

Connect cMT-SVR, router, and cMT-iV6 via RJ-45 Ethernet cable. Launch cMT Viewer on cMT-iV6, 
find the cMT-SVR and use the default password 

“111111” to log in and configure. 

cMT-SVR Ethernet Ports: 

Ethernet 1: DHCP 
Ethernet 2: 192.168.100.1 
 

 

 

cMT-iV6 series

 

                                                                                                               

Installation Instruction 

 