The Weir Group PLC
Weir Industrial Gateway setup guide rev 0.5
Copyright © Weir Minerals Australia Ltd 2017. Commercial in Confidence. All rights reserved.
Page
23
of
46
Figure 11-2 RSP shown with connector shield installed
Connector shroud must be installed at all times once connectors are in place to prevent
slurry/mud etc getting onto the connector threads AND to meet the standards certified
against for Hazardous Location operation.