The Weir Group PLC
Weir Industrial Gateway setup guide rev 0.5
Copyright © Weir Minerals Australia Ltd 2017. Commercial in Confidence. All rights reserved.
Page
1
of
46
1
Introduction and Safety
1.1
Introduction
The purpose of this manual is to provide details on how to install the Weir Industrial Gateway
in a generic sense ie independent of product type.
Read this manual carefully before installing and using the product.
1.2
Scope
The three main items covered in this guide are :
o
Power supply Module : PSM
o
Main Processor Module : MPM
o
Remote Signal Processor : RSP
The important specifications of these devices and the basic installation process will be
covered.
1.3
Target Audience
This document is directed towards maintenance fitters, technicians and any staff involved in
installing this system.
1.4
Safety
1.4.1
Safety Terminology and Symbols
You must observe the instructions contained in this manual. Failure to do so could
result in damage to equipment and/or injury or death.
1.4.2
User Safety
Use Personal Protective Equipment (PPE) according to the site regulations for that work
area. This may include, but is not limited to:
o
Hard hat
o
Safety goggles
o
Protective shoes
o
Protective gloves
o
Hearing protection
Notice:
Never work on equipment unless the correct lockout procedures have been followed