Installation and operating instruction
Oil burner WL5-PB-H purflam®
3 Product description
83242002 1/2019-03 La
13-76
W-FM 05
P11
B4
P
P
B15
L
T1 T2
F2
N
L N
I
T
T
H
T
S
T
V
T
Z
T
V Z
T
NZ
T
N
K11
5
B10
P
11
E1
6
S22
12
M
1
M1
3
Y17
M
1
M2
2
B1
13
T1
4
B1
Flame sensor
T
H
Heating time heat exchanger
B10
Air pressure switch
T
I
Initialisation time: 1 s
B15
Temperature or pressure regulator
T
N
Post-purge time: 1.2 s
E1
Heat exchanger
T
NZ
Post-purge time: 15 s
F2
Temperature or pressure limiter
T
S
Safety time: 4.6 s
K11
Solenoid valve
T
V
Pre-purge time: 16 s
M1
Fan
T
VZ
Pre-ignition time: approx. 15 s
M2
Pump motor
T
Z
During this time the motor operates at 95 % oper-
ating speed.
P11
Control lamp operation (optional)
Voltage is applied
S22
Temperature switch
Flame signal present
T1
Ignition unit
Current path
Y17
Air damper actuation (optional)
START (orange)
Ignition phase (flashing orange)
Burner operation (green)