Installation and Operating Manual
Data protocol converter Gateway WEM-KNX
8 Commissioning
83320602
▪ 1/202
1-02
▪
Ext. PHauner
30-36
8
Commissioning
Procedure
▶
Connect the gateway to KNX TP.
✓
Gateway works with its factory default settings.
▶
Connect the gateway to the IP network.
▶
Program the individual address (after commissioning/reset: 15.15.255).
▶
Configure ETS application program.
▶
Download the ETS application program into the device.
An interface connection to the KNX bus system is required for programming the configu-
ration settings via ETS.
8.1
Programming the individual address
The individual address can be assigned to the device by setting the desired address in
the properties window of the ETS. To download the individual address into the device,
the programming mode must be active. By pressing the programming button, the pro-
gramming mode can be activated and deactivated.
Procedure for programming
▶
Select the gateway in the ETS.
▶
Enter the individual address in the ETS property window.
In the factory default state, the gateway has the individual address 15.15.255. This ad-
dress should not be used for normal operation. We therefore strongly recommend that a
different address is set and being programmed during commissioning.
▶
Start the individual address download in the ETS.
✓
ETS indicates that the programming button must be pressed.
▶
Press the programming button. (If LED 5 lights up red, programming mode is active).
✓
The gateway stores the new individual address.
✓
Gateway restarts.