Installation and operating instruction
Oil burner WL20/1-C Z-1LN
7 Commissioning
83055902 1/2019-04 La
37-84
4. Adjust stage 2 switch point
Set the switch point MV2-Oil to approx.
1
/
3
of the setting movement between
ST1 and ST2.
MV2-Oil = (ST2 - ST1) x 0.33 + ST1
5. Check start behaviour and switch point
Switch off burner.
Plug in 4 pole connection plug.
Re-start the burner.
Check start behaviour.
Check stage 2 switch:
excess air phase (CO content) prior to switch over must not be too long,
flame must not fail.
If necessary correct settings.
If the existing settings have been changed:
Re-check start behaviour and switch point.