Installation and operating instruction
Oil burner WL40Z-A 1LN
7 Commissioning
83298902 2/2019-05 La
36-112
7 Commissioning
7.1 Prerequisite
Commissioning must only be carried out by qualified personnel.
Only correctly carried out commissioning ensures the operational safety.
Prior to commissioning ensure that:
all assembly and installation work has been carried out correctly,
sufficient combustion air is available, if necessary install ducted air intake
the annulus between flame tube and heat exchanger is filled
the heat exchanger is filled with medium
the regulating, control and safety devices are functioning and set correctly
the flue gas ducts are unimpeded
a measuring point conforming to standards is available to measure the flue
gas
the heat exchanger and flue gas ducting up to the test point are sound (ex-
traneous air influences the test results)
the operating instructions of the heat exchanger are complied with
a heat demand is available
Additional system-related tests could be necessary. Please observe the operating
guidelines for the individual components.
On installations with process equipment, the conditions for safe operation and
commissioning must be met, see worksheet 8-1 (Print No. 831880xx).
7.1.1 Connect measuring devices
Pressure measuring device for mixing pressure
Open pressure test point for mixing pressure
1
and connect pressure measur-
ing device.
1