Techn. Änderungen vorbehalten! Alle Maßangaben sind ca. Maße.
Copyright HRB 3662
5
- en -
Dear customer
Thank you very much for choosing a weka product.
•
Read these instructions through completely before assembling your product in order to avoid
errors in assembly or damage.
•
IMPORTANT
Please use the enclosed packing list to check immediately that your weka product has
been delivered complete and intact.
•
Please do not dispose of the packing list before the guarantee period has expired. This list
enables you to check that all the individual parts are present. It should be retained along with the
proof of purchase. Any complaints which may arise can probably be easily rectified with this list.
The item numbers on the packing list do not correspond to the item numbers in the following
assembly instructions.
•
We recommend that 2 people carry out the assembly.
•
In order to prevent accidents, we recommend that children are kept out of the direct vicinity during
assembly.
•
We reserve the right to make further technological developments. This means that there many be
minor deviations in the illustrations.
•
Please do not simply throw away the packaging material. Paper, card and corrugated board as
well as plastic packaging materials should be placed in the correct collection containers.
Our structural strength class covers more than 80% of the Federal Republic of Germany (snow load
zone 2).
If your project is outside this zone and if additional calculations or structural modifications are required,
these are not included in the quoted price.
RECOMMENDATIONS
•
Please drill pilot holes for all screw connections
to avoid damaging the wood. The following
symbol in the instructions will indicate when this is necessary:
+
•
Protect the wood from hours of direct sunlight and moisture.
•
Wood is a natural product. Fluctuations in colour, knots and cracks are normal and have no
influence on the statics.
•
A prerequisite for successful assembly, is the anchoring of the studs in the concrete foundation
using H stud supports. The stud supports are available as weka accessories for an additional cost.
•
A foundation plan can be obtained from your specialist dealer!
•
In order to facilitate the precise alignment of the H anchors, mark the necessary post clearances
on a piece of guide wood and fix the anchors in place with screw clamps (figure 1)
•
Then suspend the H anchors in the base holes already prepared. A minimum clearance of 2 cm is
to be maintained between the upper edge of the foundation and the upper strut.
•
The required roof pitch of 1% (gradient towards the rear) can be achieved by varying the height of
the stud supports.
•
The required gradient can also be achieved by shortening the studs.
•
After the holes have been filled with C25/30 concrete, the foundation must be allowed to set for at
least 3 days.
Summary of Contents for 606.3050.30.00
Page 36: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 36 4x 2x...
Page 37: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 37...
Page 38: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 38...
Page 39: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 39...
Page 40: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 40...
Page 42: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 42...
Page 43: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 43...