64
ICE MAKING SE
QUENCE OF OPERA
TION
W
at
er
Pump
Har
ves
t
Valv
e
W
at
er Inle
t
Valv
e
Dump Valv
e
Compr
essor
& Condenser Fan Mot
or *
Har
ves
t Floa
t
Swit
ch
Ice Thickness Floa
t S
wit
ch
Leng
th of Time
Har
vest
Sequenc
e
5. W
at
er
Pur
ge
Off
On
Off
Initial cy
cle,
then ev
er
y
3rd
On
Closed
Closed
20 sec
onds
W
at
er pur
ge initial c
ycle
,
then e
ver
y 3r
d c
ycle
ther
eaf
ter
6. Har
vest
Of
f***
On
Of
f***
Of
f***
On
Closed
Closed
Bin swit
ch ac
tiv
ation
7. A
ut
oma
tic
Shut
off
Off
Off
Off
Off
Off
Closed
Closed
3 M
inut
e dela
y and bin
swit
ch r
e-
closur
e
*
Condenser F
an Mot
or: The f
an mot
or is wir
ed thr
ough a f
an cy
cle pr
essur
e c
on
trol; ther
ef
or
e, it ma
y cy
cle on and of
f.
**
When the w
at
er t
emper
atur
e r
eaches 34°F the w
at
er pump de-ener
giz
es f
or 25 sec
onds . When the pump r
es
tarts the w
at
er inle
t v
alv
e ener
giz
es f
or 7
sec
onds.
*** Will be ener
giz
ed during har
ves
t when time e
xceeds 3.5 minut
es.
**** The w
at
er pump de-ener
giz
es f
or 25 sec
onds then r
e-ener
giz
es
Summary of Contents for Manitowoc NEO UDP0080A
Page 2: ......
Page 18: ...18 Part Number STH098 06 19 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 74: ...74 Part Number STH098 06 19 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 166: ...166 Part Number STH098 06 19 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...176 Part Number STH098 06 19 ELECTRONIC CONTROL BOARD UDP0080 1 2 3 4 5 6 7 8 9 10...
Page 179: ......