Piping instructions of
TRIGLAV
spa
30mA safety relay is need to be installed!
E: Electric hole (
5
00
mm) to terminal facilities through spa cabinet. 3 m cabels are required!
In case of sinking
just allowed to sinking part which is under the spa`s acrylic-flange. You have to make safe the
diversion of inlet water in the deepest point of the inspection pit. The inspection pit has to be aired accordingly
(proposal: building in an extractor fan).
The inspection pit`s minimum width is 60 cm around the spa.
If the spa is placed indoor
please make allowances for the following special requirements: The water
accumulates around the spa so the socket cover has to be in possession of a suitable drainage. This arrangement
hinders the water in collecting.
Given sizes above are only information, there may be variant sizes on the grounds of the spa`s manufacturing
technique.