easyled ikone tunable - 04/2021
9
en
3. INSTRUCTIONS
sealing piece with 1.5’’ thread (bsP) installed in the basin.
Connection box connected via watertight PVC pipes within 2 m of the sealing piece.
Power cable in the connection box.
Preparation of the hubcap in the choice ROUND OR SQUARE :
Installing in the pool:
Electrical connection :
1. Verify that the sleeve lugs and the resin-coated, heat-
retractable sheath are in place.
2. insert the resin-coated, heat-retractable sheath into one
of the tow cables, and then connect the two cables together
using the sleeve lugs, which must be mounted on either
side by means of an appropriate clamp.
3. do an electrical test before gluing the sheath.
4. Faire coulisser la gaine et la positionner de manière à
avoir la cosse manchon au milieu et une même longueur
de gaine sur chacun des 2 câbles.
5.slide the sheath into position, so the sleeve lug is in the
middle and there is the same length of sheath over both
cables.
Heat the sheath with a heat gun, moving from the center
of the sheath outward, to prevent the formation of any air
pockets in the middle.
to aVoid buRninG tHe sHeatH, do not Hold tHe Heat Gun
too Close to it.
5.you will be done once the entire length of the sheath has
retracted.you will see a little resin seeping out at both ends.
the purpose of this sealing process is to prevent the
infiltration of water into the projectors via the copper strands
in the cables. if our after-sales service observes any such
infiltration, this will void the warranty on those projectors. “
THE CONNECTION MUST ALWAYS BE ABOVE THE WATER
.