8. Testing
8.1 Testing Prior to Initial Start-Up
• Inspection to assure that the ESPE has been correctly selected in accordance with local ordinances, and
testing to assure that they provide the required protection when used for their intended purpose.
Execute testing:
• Prior to initial start-up
• After making changes to the machine
• After the machine has been shut down for a lengthy period of time
• After modifying or repairing the machine
NOTE!
• Observe regulations regarding the training of operating personnel by experts before they
begin work.
• The company which operates the machine is responsible for training.
Testing
Effectiveness of the ESPE must be assured in all operating modes which can be selected at the
machine.
• Testing according to checklist
(see section “12.5 Initial Start-Up Checklist” on page 68)
NOTE!
• Work at the machine must be immediately stopped if any impairment of the safety function
is detected.
• If the safety function is impaired, test the effectiveness of the ESPE at the machine once
again in accordance with the checklist
(see section “12.5 Initial Start-Up Checklist” on
.