8
2. Locate the drain hose. Make sure that the cap (not
shown) is fully tightened onto the end of the drain
hose.
Locate the two indicated gate valves inside of the
spa. Make sure that the gate valves are open and
that the locking clips are snapped onto the stems of
the gate valves. In addition,
Make sure that all of the collars such as the one
indicated are tightened.
See step 1. Re-attach the Access Panel (15) with
the four #10 x 2” Sheet Metal Screws (6).
Before beginning assembly, carefully read the
following information and instructions:
• Place all parts in a cleared area and remove the
packing materials from the spa shell. Do not dis-
pose of the packing materials until assembly is
completed and the spa is operating.
• During assembly, make sure that all parts are
oriented as shown in the drawings.
• Read each assembly step before you begin.
• Tighten all parts as you assemble them, unless
instructed to do otherwise.
ASSEMBLY REQUIRES THE FOLLOWING
TOOLS (not included):
• One phillips screwdriver
• You will also need a small amount of soap and
a damp cloth.
A wire connector is provided on the electronics
pack of the spa to connect a minimum No. 8
AWG (8.04 mm
2
) solid copper conductor
between the spa and any metal equipment,
electrical enclosure made of metal, metal water
pipes, or conduit within five feet of the spa.
1. Before beginning assembly, make sure that you
have read and understand the information in the
box above and on the previous two pages.
Remove the four indicated #10 x 2” Sheet Metal
Screws (6). Remove the Access Panel (15) by sliding
it down and then pulling the bottom away from the
spa. Be careful not to damage the spa shell.
Assembly
Drain
Hose
Collar
6
6
15
1
Spa Shell
2
Gate Valve