7
STEP 3
1. Fix Right Swing arm (6R) onto the long axis of Handlebar post (4) with Hex bolt (33), Spring washer (51),
Flat washer (34), Wave washer (25) and Long axis (39). Don’t lock it.
2. Fix the Right Connecting rod (5R) on the Crank (14) with Right Pedal bolt (26R), Wave washer (25), Spring
washer (15) and Nylon nut (16R). Don’t lock it.
3. Connect the Right Swing arm (6R) and Right Connecting rod (5R) with Hex bolt (31), Flat washer (20),
Nylon nut (21);then lock the Hex bolt (33), Hex bolt (31) and Nylon nut (16R);at last cover the Cap (22), End
cap (17), Cap (52)
4. Fix the Left Swing arm (6L) and Left Connecting rod (5L) onto the long axis of Handlebar post (4) and crank
in the same way.
5. Lock the Pedal (29L/R) on the Left/Right Connecting rod (5L/R) with Hex bolt (30), Flat washer (28), Nylon
nut (27)
Attention! There are Right and Left Pedal hinge bolt. Separately install the Right Pedal hinge bolt CLOCK-
WISE and the Left Pedal hinge bolt COUNTERCLOCKWISE. You can turn the crank so to install the Pedal
bolt (L/R) smoothly.