Section BXB-19D-20A
030-100689 Rev. A
R
8
1009IARA
Install battery box.
Once the battery box holes are aligned with the matching holes in
the template, set the battery box on top of the insulating gasket
and template. When the
holes are aligned, insert a
bolt through each |
set of aligned holes,
and drive the bolts
into the threads of
the anchors in the
concrete under the
template. Tighten
all bolts securely,
and test the
installation
stability by
attempting to
move or wiggle
the box.
Tighten any
looseness.
Prepare concrete pad and place template on pad.
Dig and frame the pad location per company practice. Allow for 12"
of concrete past the perimeter walls of the template (a 48" wide by
42" deep pad is suggested). Once the pad is framed for concrete,
but before pouring gravel or concrete, install any cable conduit or
ductwork that is desired to be routed through the concrete and which
will enter the battery box from the bottom. Fill and compact the pad
site with gravel per company practice. Pour concrete and level to
grade or slightly above −
the top surface of the pad must not be be-
low grade level
. While the concrete is wet, set the template onto the
top surface of the concrete, being sure the anchors are fully im-
mersed and surrounded by wet concrete. Remove any spilled con-
crete from the top of the template or from the bolts before it dries.
After concrete dries, remove bolts.
When the concrete is
cured, remove the bolts.
If the insulating gasket is used (shown in Step 1), place it on top of
the template, and be sure it does not cover
the holes in the template below it
where conduit, innerduct or
cable access holes are
desired.
Ð
52"
63"
Align all holes in bottom of battery box with all anchor
holes.
Locate the nine small holes at the bottom of the box. Align
the holes in the bottom of the box with the holes in the pad, tem-
plate, gasket, and the anchors.
Figure 9.
Concrete Pad Mounting
Í
Ê
Ë
Î
Ï
Examine kit
contents.
Locate the
A90-BXA-19PT2 pad
mount template kit
and examine and
separate all parts.
Ì
Align bolts, holes,
and anchors.
Insert
bolts through the 9
holes in the galva-
nized template, align
each screw with an
anchor, and firmly
tighten the bolt to the
anchor, with the tem-
plate between them.
See Figure 20 for
template dimensions
and hole sizes.
Galvanized
template
9 Bolts
9 Concrete anchors
Affix anchors
and bolts to tem-
plate.
Firmly tighten
the bolts to the an-
chors, with the tem-
plate between them.
Bottom view of battery box
Holes for anchors
1.5" hole for
AC conduit
Front door panel of
battery compartment
Insulating gasket