Ethernet Switch Upgrade Kit Install Instructions
A99-BAI-ACSF-UGKIT
Step 2: Install the second Ethernet switch over the first and re-
install the DIM rail stop
Step D: Connect power and frame ground
•
Route and connect the green 14 AWG wire from the Ethernet
switch to the frame ground of the cabinet
•
Route and connect the black 14 AWG wire from the Ethernet
switch to the bottom row terminal strip (GND) of the DC power
supply. Install in an open position next to the existing black wire
Step E: Verify work and re-apply power
•
Double check the installation and wiring of the second
Ethernet switch
•
Re-apply power to the cabinet
Customer & Technical Services
If Technical or customer assistance is required, contact Westell by
calling or using one of the following options:
•
Call: (800) 377-8766
•
Email: support@westell.com
Warranty & Repairs
Westell warrants this product to be defect-free at shipment time.
Westell also warrants this product to be fully functional for the
time period specified by the terms and conditions governing the
sale of the product. Equipment repairs/modification attempts by
an unauthorized person will void the warranty.
030-300732 rB 04/29/16
Page 3 of 3
Step C2: Install 2nd Ethernet Switch using plate
method for part number A99-APC1BAI-ACSF
revision W and above.
Step 1: Remove the existing end stop from the Ethernet DIN rail
•
Route and connect the red 14 AWG wire from the Ethernet
switch to the top row terminal strip (48DC) of the DC power
supply. Install in an open position next to the existing red
wire