Page
26
of
55
Operati
on
11.2
Running-in period
The first 50 hours of operation have a major impact on the performance and
service life of the CM2
XL
.
The following considerations should be taken into account to ensure you
enjoy your CM2
XL
for a long time.
The engine can be run from start to full speed, but heavy loads
should be avoided. Stalling the engine is to be avoided!
Check fluid levels (oil, ...) frequently during running-in and
check for leaks.
Repeatedly inspect nuts, bolts and screws etc. and re-tighten if
necessary.
Pay particular attention to wheel bolts!
Use only clean DIESEL fuel
Proper maintenance is of crucial importance for
the operational safety of the vehicle.