22
6650-2260
Point-to-point application
Configure the network
Check that it is running correctly with the electrical serial network.
…
Prepare the fibre optical network
Connect the fibre links between the units.
…
Connect the power supply to all units.
…
The Fibre links should be in operation, indicated by active CH 1 LED's.
…
Connect the LON equipment to the LRW-112PP.
…
The point-to-point application is up and running.
…
TX RX
TX RX
CH 1
CH 1
LON
Network
LON
Network