87
The PMI PoE Switch supports an useful function that help user to mainten the
PD’s status and help use to savng the maintenance time and money.
IP address
: the PD’s ipaddress that installed on the port.
Cycle time
: user measured the PD system boots duration time. The unit is
second. Most of PD system – IP camera will take at least 40~50 seconds. Here, we
suggest user sets the cycle time to 90 seconds prevents any wrong suppose.
Once user defined this function, the PoE Switch will request PD system and turn-
off PoE power if PD system does not echo the request. After the duration time
(cycle time), the PoE switch will start request PD again. This function also named
link partner line detection (LPLD)
.
Summary of Contents for PMI-110-F2G
Page 1: ...1 PMI 110 F2G User s Manual Version 3 0 Industrial Managed PoE Switch ...
Page 5: ...1 5 2 Westermo Private MIB 234 5 3 Revision History 235 ...
Page 19: ...15 ...
Page 168: ...164 4 8 3 DSCP Queue Mapping 4 8 4 CLI Commands of the Traffic Prioritization ...
Page 193: ...189 ...
Page 234: ...230 Note No CLI command for this feature ...
Page 240: ...236 ...