RT-610 HV/LV User Guide
Page 15 (31)
3 Installation
3.1 Installation Procedure, Overview
Order of Installation Step
Description
1. Fixing
The product is fixed in operating environment, ensuring that the environment
complies with the installation environment constrains. See chapter 3.2
2. System Grounding
The system grounding is ensured and verified based on customer installation.
See chapter 3.4
3. Antennas
The antenna interfaces are installed based on customer requirements. See
chapter 3.5
4. Ethernet
The Ethernet data interfaces are installed. See chapter 3.6
5. Power Feed
Power feed cable is connected (the power may be already activated in the
cable), the power supply is switched on and verify that the LED indicators shows
correct power up procedure. See chapter 3.7
6. Configuration
The configuration process is described in reference document Software 6
Management Guide [1]
chapter: Configuration.
Table 8 Installation procedure