6 Pre-Installation Site Requirements
This chapter describes the tasks that are necessary to complete before the installation of the product in order
to make the installation process as smooth and safe as possible.
6.1
Required Equipment for Installation
Before you begin the installation, ensure that you have the following items:
• #2 Philips-head Screwdriver
• Level
• ESD wrist strap or other grounding device
• Box Cutter
• Tape Measure
6.2
Servicing Space Requirement
The 4U60 G2 Storage Enclosure requires that enough space be available at the front and the rear of the rack
it is installed into and service rack components. The front space requirement is based on the length of the
enclosure, plus the space necessary to fit a person servicing the rack equipment. The rear space requirements
is based on space a technician would need to service all of the CRU parts at the rear of the unit.
Table 3: Space Requirement Specifications
Value
Specification
1220mm (48in.)
Minimum Front of Rack Space
560mm (22in.)
Minimum Rear of Rack Space
Figure 3: Minimum Servicing Space Required
FRONT
REAR
1220mm /
48in.
560mm /
22in.
Top of Rack
6.3
Delivery Route Inspection
During the receiving process, the enclosure will need to be moved through the facility until it reaches the
datacenter or computer room where the enclosure will be installed. This section describes the considerations
that the installation team should make before receiving the enclosure and moving it through the facility.