CP600 Pivot Operation Manual
POM-EN-Dec
ember 20
18
28
1. Lock the power disconnect switch in the “OFF” position. Be sure all electrical panels are closed
and securely latched.
2. Drain the center pivot supply line to a level below the frost line.
3. Remove the flush cap and Flex-Span supply hose. Make sure the low pressure drain valves
are working and that the center pivot is completely drained.
4. Disconnect poly line tubes from solenoid valves and end gun components to drain water from
lines.
5. All sprinkler control valves should be in the “open” position and drained. Valve control hoses
should be drained. Solenoid manifold assembly filters should be cleaned.
6. Protect moving parts and bearing surfaces against rust and corrosion by greasing all fittings.
7. Sufficient oil should be drained from the center and wheel gearboxes to remove water and con-
taminants. Refill with manufacturers specified lubricant.
Section 1-24
Operation, Safety & Maintenance
Winterizing
Summary of Contents for CP600
Page 1: ...CP600 Pivot Operation Manual POM EN December 2018 ...
Page 2: ...2 This Page Intentionally Left Blank ...
Page 5: ...5 POM EN December 2018 CP600 Pivot Operation Manual Section 1 Operation Safety Maintenance ...
Page 6: ...6 This Page Intentionally Left Blank ...
Page 41: ...CP600 Pivot Operation Manual POM EN December 2018 41 Section 2 General Information ...
Page 83: ...CP600 Pivot Operation Manual POM EN December 2018 83 Section 3 Getting Started ...
Page 89: ...89 This Page Intentionally Left Blank ...
Page 98: ...98 This Page Intentionally Left Blank ...
Page 99: ...CP600 Pivot Operation Manual POM EN December 2018 99 Section 4 Panel Operation ...
Page 112: ...112 This Page Intentionally Left Blank ...
Page 113: ...CP600 Pivot Operation Manual POM EN December 2018 113 Section 5 Electrical ...
Page 119: ...119 This Page Intentionally Left Blank ...
Page 123: ...123 This Page Intentionally Left Blank ...
Page 128: ...CP600 Pivot Operation Manual POM EN December 2018 128 Section 5 16 Electrical Notes ...
Page 129: ...CP600 Pivot Operation Manual POM EN December 2018 129 Section 5 17 Electrical Notes ...
Page 130: ...CP600 Pivot Operation Manual POM EN December 2018 130 Section 5 18 Electrical Notes ...
Page 131: ...CP600 Pivot Operation Manual POM EN December 2018 131 Section 5 19 Electrical Notes ...
Page 132: ...132 This Page Intentionally Left Blank ...
Page 133: ...133 Section Title This Page Intentionally Left Blank ...
Page 134: ...134 POM EN December 2018 www western irrigation com ...