WESTFIRE · WF
21
14
4.
8.
7.
3.
5.
9.
1.
6.
2.
10.
uk
VerMiCuLite Fire BriCk instaLLatiOn seQuenCe – WestFire uniQ 21
Left inner top baffle bricks 1 positioned on
secondary air pipe & side supports.
installation procedure:
Right inner top baffle brick 2 – positioned
on secondary air pipe & side supports.
1 – Left Inner Top Baffle Brick
2 – Right Inner Top Baffle Brick
3 – Rear Brick
4 – Left Base Brick
5 – Right Base Brick
6 – Left Angled Side Brick
7 – Right Angled Side Brick
8 – Left Side Brick
9 – Right Side Brick
10 – Top Baffle Brick
Right inner top baffle brick 2 – positioned
on secondary air pipe & side supports.
Top baffle bricks 2 & 3 fitted.
Rear brick 3 – line up tertiary air holes.
Front face of brick has smaller surface area.
Left & right base bricks 4 & 5 fitted – with
metal base brick tensioner positioned
at side.
Left and right angled side bricks 6 &
7 fitted.
Left and right angled side bricks 6 &
7 fitted.
Left and right side bricks 8 & 9 fitted.
Left and right side bricks 8 & 9 fitted.
Top baffle brick 10 (smallest straight edge
resting on top edge of rear brick) fitted
and supported with two side pins.