Clean the Carafe and Coffee Mill Assembly
NOTE:
Unplug the Coffee Maker during cleaning!
1.
Clean the carafe, carafe lid, the filter basket and filter basket lid in warm soapy water.
Rinse thoroughly and dry.
2.
Make sure the Coffee Maker is off.
DO NOT USE COFFEE.
3.
Fill the water reservoir to the 10-cup mark with cold water.
4.
Insert the filter basket and filter basket lid into the Coffee Maker taking care to seat it
properly. Close the Coffee Mill lid
NOTE:
The Coffee Mill lid must be closed securely in order for the brew cycle to begin.
5.
Plug in the Coffee Maker, a default time setting and GRIND will appear in display.
Press On/Off and the Coffee Maker will begin to grind and ON GRIND will appear in the
display. After a few seconds, the water will begin to cycle through the Coffee Maker and
into the carafe. ON will appear in the display.
NOTE:
A time will also appear in the display. To set the clock for the accurate time, follow the
procedure in Setting the Clock below.
6.
When the carafe is full, HEAT ON will appear on the display.
7.
Press On/Off to turn off the Coffee Maker. Discard the water in the carafe. Wait 10
minutes to allow heating elements to cool. Repeat this procedure one more time.
CAUTION:
BLADES ARE SHARP. DO NOT ATTEMPT TO DISASSEMBLE COFFEE MILL ASSEMBLY.
Setting the Clock
If your Coffee Maker is NOT on a SANI network, follow these steps to set the clock manually:
NOTE: You do not have to set the clock in order to brew coffee.
1. Press and hold Time until the time display begins to flash, then release. To adjust the hour
press Hour repeatedly until the desired hour is displayed. To advance the display rapidly, press
and hold Hour. Be sure to set the correct AM or PM hour.
2. To adjust the minute: press minute repeatedly until the desired time is displayed. To advance
the display rapidly, press and hold Minute.
3. When the desired time is set the display will flash. Press Time to save your setting
or the
setting will automatically be saved
if you don’t press the Time button and return to a
normal display.
11
Control Panel
Use the control panel to program all of the Coffee Maker’s functions.
On/Off:
Press to toggle Coffee Maker on or off.
Select:
Press to select grind setting (see instructions on page 12).
Hour:
Press to set hours when setting the time manually.
Min:
Press the set minutes when setting time manually.
Time:
Press to set time of day or programmed start time.
Network:
Press to connect your Coffee Maker to an iCEBOX via a wireless network.
Please refer to instructions beginning on page 14.
LCD display:
Displays time of day, date and Coffee Maker status.
Program:
Press to enter a preset brew time.
10
Coffee Maker Owner’s Manual
5. Before Using Your Mill & Brew Coffee
Maker for the First Time
Summary of Contents for Beyond WBYCM2
Page 1: ...WBYCM2 ...
Page 20: ......